一键通话,免费咨询 快速咨询
首页 >您现在的位置: test4exam >> 计算机考试 >> CISCO认证 >> 正文

新版CCNP

Until July 31, 2010 candidates have four different paths to CCNP certification:

Path 1: Candidates already in the process of certifying may use their passing scores on ISCW and ONT. This path is not recommended for candidates who have not yet attempted ISCW or ONT.

CCNP Exams & Recommended Training

Required Exam(s)

Recommended Training

642-901 BSCI
Last day to test: July 31, 2010
Building Scalable Cisco Internetworks (BSCI)
OR
642-902 ROUTE
Available March 10, 2010
Implementing Cisco IP Routing (ROUTE)
642-812 BCMSN
Last day to test: July 31, 2010
Building Cisco Multilayer Switched Networks (BCMSN)
OR
642-813 SWITCH
Available March 10, 2010
Implementing Cisco IP Switched Networks (SWITCH)
642-825 ISCW
Last day to test: July 31, 2010
Implementing Secure Converged Wide Area Networks (ISCW)
642-845 ONT
Last day to test: July 31, 2010
Optimizing Converged Cisco Networks (ONT)
OR

Path 2: Same as Path 1, except that the single COMP exam is used instead of the individual BSCI and BCMSN. Again, this path is not recommended for candidates who have not yet attempted ISCW or ONT.

Required Exam(s)

Recommended Training

642-892 Composite
Last day to test: July 31, 2010
Building Scalable Cisco Internetworks (BSCI)

Building Cisco Multilayer Switched Networks (BCMSN)
642-825 ISCW
Last day to test: July 31, 2010
Implementing Secure Converged Wide Area Networks (ISCW)
642-845 ONT
Last day to test: July 31, 2010
Optimizing Converged Cisco Networks (ONT)
OR

Path 3: Candidates substitute the new TSHOOT exam (or TSHOOT beta exam) for ISCW and ONT, passing three exams to complete CCNP certification. This is the recommended path for candidates who have not yet taken the ISCW or ONT courses or exams and will become the only available path after July 31,2010.

Required Exam(s)

Recommended Training

642-901 BSCI
Last day to test: July 31, 2010
Building Scalable Cisco Internetworks (BSCI)
OR
642-902 ROUTE
Available March 10, 2010
Implementing Cisco IP Routing (ROUTE)
642-812 BCMSN
Last day to test: July 31, 2010
Building Cisco Multilayer Switched Networks (BCMSN)
OR
642-813 SWITCH
Available March 10, 2010
Implementing Cisco IP Switched Networks (SWITCH)
643-832 TSHOOT BETA
Available: February 16-March 26, 2010
Troubleshooting and Maintaining Cisco IP Networks (TSHOOT)
OR
642-832 TSHOOT
Available: April 30, 2010
OR

Path 4: This is the recommended path for candidates who have passed the COMP exam but not ISCW or ONT. This path can also be used by candidates who will be ready to take (and pass) the COMP exam before July 31, 2010. Please note that candidates who fail an exam attempt must wait five (5) calendar days, beginning the day after the failed attempt, before they may retest for the same exam.

Required Exam(s)

Recommended Training

642-892 Composite
Last day to test: July 31, 2010
Building Scalable Cisco Internetworks (BSCI)

Building Cisco Multilayer Switched Networks (BCMSN)
643-832 TSHOOT BETA
Available: February 16-March 26, 2010
Troubleshooting and Maintaining Cisco IP Networks (TSHOOT)
OR
642-832 TSHOOT
Available: April 30, 2010
欢迎报考

苏州迈峰教育科技有限公司
地址:苏州市姑苏区阊胥路483号9号楼(工投科技创业园)
苏ICP备15050684号-2